LED DISPLAY SYSTEMS · RETAIL · ARCHITECTURE · LIVE EVENTSEN / info@narvend.com+86 131 2630 3133
NARVEND / BUYING AND PROCUREMENT

LED Display Export Order Checklist

Most problems on an export order are decided before the display is built, not after it lands.

The short versionAn export order has six things to settle before production starts: the mains voltage, frequency and plug of the destination country; the documentation set that will be needed at import and at commissioning; how the order is packed for its route; what spares travel with it; who can service it once it is installed; and how acceptance is recorded at the far end. Getting these six settled in writing costs little before manufacture and a great deal to fix afterwards. On a NARVEND order, factory acceptance testing is open to customers before shipment, the standard warranty on regular product lines is two years, and payment is 50 per cent to start and 50 per cent before shipment.

Start with the supply it will be plugged into

The destination country decides the voltage, the frequency and the plug, and those are three separate lines on an order. North America is about 120 V at 60 Hz, Europe and most of Africa and Southeast Asia are 230 V at 50 Hz, and Brazil can be either 127 V or 220 V at 60 Hz depending on the city.

A display with a rated input range covering both families removes the question. A display with a single rated voltage has to be built for the country it is going to, and that decision has to be made before production, not at the installation.

Settle the documentation before production

Ask for the nameplate data, the wiring diagram and the manuals to be settled as part of the order, including the language they are supplied in. Import clearance, insurance and the local electrical inspection all work from documents, and a missing sheet stops a project as effectively as a missing part.

Test records belong in the same set. Factory acceptance testing is open to customers before shipment, and that is the point at which the supply rating, the configuration and the documentation can be checked against the order while everything is still in one place.

Packing for the route, not for the warehouse

Packing has to suit how the order travels. A crate that survives a forklift in a factory does not automatically survive a port transfer and a road leg, and the route decides the crate specification, the bracing and the moisture protection.

Labelling matters as much as the crate. Each case should be identifiable against the packing list so that a partial delivery or a damaged case can be reconciled on site without opening everything to find out what is inside.

Spare parts travel with the order

Decide what spares ship with the display and write it into the order. Modules, power supplies and receiving cards are the parts that get replaced. Having them in the crate turns a failure in the first weeks into a swap on site, and leaving them out turns it into a second shipment.

The quantity is a decision for the buyer, made against how long the display has to stay running and how far the site is from a supplier. It is cheaper to agree it before manufacture than to air freight it later.

Service access after it arrives

Establish who maintains the display and from which side. Front service cabinets come out from the viewing face, rear service cabinets need a walkway behind the wall, and the building has to be designed for whichever one the order specifies.

Time zones decide the rest. Support across a working day that is twelve hours away from the manufacturer is a scheduling question, so agree the contact path and the response expectation while the display is being installed, not after it fails.

Acceptance at the far end

Acceptance is a record, not an impression. Agree what is checked, what counts as a pass, and who signs, so that a disagreement about uniformity or a dead pixel is settled against a written criterion instead of an opinion.

Two commercial items belong on the same page as the technical ones. The standard warranty on regular product lines is two years, and payment is 50 per cent to start production and 50 per cent before shipment.

A 230V wall sent to 120V

One order assumed the home market's voltage. At the destination the power did not match and commissioning stalled until transformers were sourced locally at premium cost.

Spares that missed the boat

A buyer accepted a quote without travel spares. When a module failed, the replacement crossed an ocean on a separate shipment and the wall stayed dark for weeks.

Applying this on site: export order checklist

  1. Confirm destination electrical first Lock the voltage, frequency and plug type for the destination market before production. Wrong mains specs mean a wall that cannot be energised.
  2. Settle documents before build Agree the test records, certificates and any local-language manuals needed at customs and commissioning, and generate them during production.
  3. Pack for the actual route Choose packing rated for the real journey, sea, multiple handling points, humidity, not just warehouse storage.
  4. Send spares with the order Include the agreed spare modules and cards in the same shipment so a fault does not wait on a separate international delivery.
  5. Define far-end acceptance State how the display is accepted on arrival, inspection, test run, who signs, so disputes do not start at the port.

What people get wrong about export order checklist

“The supplier handles all export paperwork.” — The supplier can prepare documents you specify, but the responsibility to list certificates, voltages and manuals rests with the order. Missing items delay customs, not the factory.

“Warranty means spares arrive fast.” — A warranty entitles you to a replacement; it does not move it across borders quickly. Travel spares on the original shipment close the gap.

The decision in one line: export order checklist

Six items belong on an export order before production: destination voltage, frequency and plug; the documentation and test records; packing for the actual route; the spares that travel with the display; who services it and from which side; and how acceptance is recorded at the far end. Factory acceptance testing is open to customers before shipment, which is the cheapest place to catch a mismatch.

Next step

Tell us about your venue.

A few details on audience, layout and schedule get you a concrete recommendation.

Request a project brief →

Questions about export order checklist

Can I inspect the display before it ships?

Yes. Factory acceptance testing is open to customers before shipment, and it is the point to check the supply rating, the configuration and the documentation against the order while everything is still in one place.

What are the payment terms?

Payment is 50 per cent to start production and 50 per cent before shipment.

How long is the warranty?

Every regular product line carries a standard two-year warranty.

Do spare parts come with the display?

They can, and it is worth specifying. Modules, power supplies and receiving cards are the parts that get replaced, and the quantity is a decision for the buyer made against how long the display has to stay running.